Advancing
an invaluable resource
This project
corrected numerous
deficiencies in the original design.
An aggressive schedule required
JC Beal Construction to develop a
"critical path" method using
15,000 square feet of staging
platforms located 40 ft. above
the pool deck to break the work
down into eight overlapping
components that were physically
separated from one another. This
"project within a project" method
contributed to JC Beal Construction
winning a WCA Pyramid Award for
Best Innovation.
LOCATION:
Ann Arbor,
Michigan
PLAN:
Infrastructure
improvements including roof repair, new lighting,
air handling and humidity control,
pool lining, and water filteration
TEAM:
JC Beal Construction Inc.
U of M Plant Extension
Simpson Gumpertz & Heger, Inc.
McNamee, Porter and Seely, Inc.
PHOTOGRAPHY:
Stephen Graham Photography
AWARD:
2000 Pyramid Award - Best Innovation for staging methods and "project-within-a-project" scheduling
|